According to the JKNS statement as reported by The Star (via Bernama), a faulty extension cord caused a power disruption in the operating theatres of Sabah Women and Children's Hospital (HWKKS) on 13 May 2025, and an internal fault in the UPS system also prevented the emergency generator from operating. Sabah Media's Malay-language report of the JKNS statement does not name the hospital or the date. It describes the chain this way: a damaged extension cable was identified as the cause; the main circuit breaker at the sub-main switchboard tripped; the UPS at the general operating theatre (Dewan Bedah Am) then stopped working, and the generator did not take over automatically. Neither report says how long power was out, whether an operation was under way, or what happened to patients.
JKNS said the Health Ministry had issued a directive banning extension cords in hospitals and told all hospitals to remove any still in use. It said it had instructed its hospital support services concessionaire to step up monitoring of generators, UPS systems, electrical distribution panels and critical medical equipment in operating theatres. The Star names the concessionaire as Sedafiat Sdn Bhd. Sabah Media says UPS replacement projects have been carried out at hospital level. On 17 November 2026, two days before the statement, Wangsa Maju MP Zahir Hassan told the Dewan Rakyat that a doctor at an unnamed Sabah hospital had to stitch up a patient by phone flashlight during a power failure. He said the absence of a functioning UPS contributed. The Star reported no ministry response, and Sabah Media reports that the Malaysian Medical Association urged the ministry to investigate. None of these sources says whether the MP's claim concerns the HWKKS incident.[1,2,3,4,5,6,7]