On 19 July 2022 (London peaked at 40.3°C) condenser high-pressure trips shut down cooling at the Guy's data centre, which reached 50.3°C; the St Thomas' data centre suffered disk and controller failures. The two sites were each other's backup, a design the trust's review said could not cover a shared environmental cause. Cooling concerns had been raised in 2018 and a £195k replacement request from March 2022 was still unapproved. The remote environment monitoring for St Thomas' was hosted on the storage network that failed, and email alerts stopped.
The trust declared a critical incident and moved to a 'Paper Hospital'. IT recovery took several weeks before near-complete restoration, slowed by 371 interlinked systems; the critical incident was stood down on 21 September 2022. In the weeks ending 24 and 31 July, activity fell to 64% of the historic July average for referrals and 68% for diagnostic tests. The same heat caused a cooling failure in a Google Cloud London zone that day.[1,2]